Rewiring Cost in 2026: What a Full or Partial Rewire Costs
The short answer
- £5,500 to £6,500 to fully rewire a typical 3-bed house, the middle of five UK cost guides
- £3,500 to £5,000 for a 2-bed home and £7,000 to £8,500 for a 4-bed house; London costs more
- £400 to £550 for a standard new consumer unit (fuse box), more with surge or arc fault protection
- £150 to £280 for an EICR on a typical house; landlords in England need one at least every 5 years

Retrofit Planner's comparison of five UK cost guides puts a full rewire of a typical 3-bed house at £5,500 to £6,500 in 2026. A 1-bed flat costs about £2,500 to £3,500, a 2-bed home £3,500 to £5,000, a 4-bed house £7,000 to £8,500 and a 5-bed house £8,500 to £12,000. A new consumer unit, the modern fuse box, costs £400 to £550 on its own, and an electrical installation condition report (EICR) £150 to £280 for a typical house. There is no free official price data for electrical work, so every range here is the middle half of the published prices, which we show side by side below. In England, landlords must have the electrics inspected at least every 5 years, and a rewire or a new consumer unit has to be certified under Part P of the Building Regulations.
Rewiring cost by home size
A full rewire costs about £2,500 to £3,500 for a 1-bed flat, £5,500 to £6,500 for a 3-bed house and £8,500 to £12,000 for a 5-bed house. The number of rooms, and so of circuits, sockets and lights, decides most of the price.
| Home | Typical full rewire | Time on site |
|---|---|---|
| 1-bed flat | £2,500 to £3,500 | 2 to 5 days |
| 2-bed flat or house | £3,500 to £5,000 | 3 to 7 days |
| 3-bed house | £5,500 to £6,500 | 4 to 10 days |
| 4-bed house | £7,000 to £8,500 | 5 to 14 days |
| 5-bed house | £8,500 to £12,000 | 6 to 16 days |
The data behind this table
The middle half of the full rewire prices published by MyJobQuote, BestBuilders, Rated People, Fantastic Services and Trade2Base, read on 11 November 2026, worked out the same way as our other ranges (see "How we work out our range" below). For Fantastic Services we use its figures for the UK outside London and the South East; its London column is higher. BestBuilders gives two sets of figures for the same homes in different parts of its page; we use its table by property size, which matches its own FAQ. MyJobQuote's 1-bed figure is for a flat, and it prices a 2-bed flat and a 2-bed house the same. Times are the spread of what the five guides say.
Read the detail
Electricians price a rewire by its circuits and its points, meaning every socket, switch and light. Trade2Base counts 6 to 8 circuits in a 1-bed flat, 10 to 14 in a 3-bed terrace or semi and 18 to 24 in a large 5-bed house, which is why the price climbs so steeply with size. Most of the bill is labour: MyJobQuote splits a 3-bed rewire into about £3,000 of labour and £1,050 of materials, and puts electricians' day rates at £200 to £400. Rated People gives an average day rate of £320.
The house type matters as well as the bedrooms. MyJobQuote prices a terrace at £4,000 to £6,500, a semi at £5,000 to £8,500, a detached house at £6,500 to £10,500 and an old house at about £7,500 to £12,500. BestBuilders adds 10 to 20% for homes built before 1960 with lath and plaster walls, and MyJobQuote lists solid brick, stone and concrete walls among the things that raise the price, because cables have to be chased into the wall or run on the surface.
An empty house is quicker to rewire. Trade2Base says labour time rises by 20 to 30% when the home is lived in, and Rated People says electricians work faster in an empty home. Expect to be without power for part of the job: BestBuilders puts it at 3 to 4 days for a 3-bed semi.
Region matters too. Fantastic Services puts London and the South East 15 to 25% above the rest of the UK. BestBuilders puts London 30% above the UK average and the North and Yorkshire 10% below it. Rated People says labour can cost up to 20% more in London and the South East.
What five cost guides say
Published prices for a full rewire of a 3-bed house run from £3,500 to £8,000. Our range is the middle half of every figure the five guides give, which sets aside the cheapest and the dearest.
| Guide | Full rewire, 3-bed house | New consumer unit | EICR |
|---|---|---|---|
| MyJobQuote, updated 3 November 2026 | £6,500 (single figure) | Not priced on its own | About £150 |
| BestBuilders, updated 31 August 2026 | £4,500 to £7,500 (3-bed semi) | £450 to £900 (basic board) | £150 to £280 (3-bed home) |
| Rated People, 2026 prices | £5,800 to £6,300 | About £320 | £80 to over £300 |
| Fantastic Services, 2026 prices | £5,500 to £8,000 (outside London and the South East) | Not given | £180 to £280 (3-bed, outside London and the South East) |
| Trade2Base, 8 June 2026 | £3,500 to £5,500 (3-bed terrace or semi) | £400 to £550 (10-way dual RCD board) | £150 to £250 at the end of a rewire |
| Our range: the middle half | £5,500 to £6,500 | £400 to £550 | £150 to £280 |
The data behind this table
Read on 11 November 2026. BestBuilders and Fantastic Services say their prices include VAT and Rated People says its prices leave it out; MyJobQuote and Trade2Base do not say. BestBuilders' figures come from its own regional cost model. Trade2Base writes for electricians pricing their own jobs, so its figures are trade prices and sit at the low end. Rated People first published its page on 27 September 2022 and says its costs are accurate as of 2026; Fantastic Services' pages carry no date beyond 2026. Checkatrade's and MyBuilder's rewiring pages refused our requests, so their figures are not in the table.
Read the detail
Four of these guides come from websites that match homeowners with tradespeople (MyJobQuote, Rated People, BestBuilders and Trade2Base) and one from a home services firm that also sells electrical work (Fantastic Services). They disagree most on what a rewire includes. Rated People's price includes a new consumer unit, filling the holes with plaster and testing; Trade2Base's includes the consumer unit, an EICR on completion and Part P notification; MyJobQuote includes a new consumer unit only if it is agreed beforehand. Decorating is extra in every guide.
How we work out our range
For each size of home we put every published figure into one list: both ends of a range, or the single figure where that is all a guide gives. Our range is the middle half of that list, from its lower quartile to its upper quartile, rounded to the nearest £500 for a rewire, £50 for a consumer unit and £10 for an EICR. For a 3-bed house the list is £3,500, £4,500, £5,500, £5,500, £5,800, £6,300, £6,500, £7,500 and £8,000, which gives £5,500 to £6,500. For a standard consumer unit it is £320, £400, £450, £550 and £900, which gives £400 to £550; only three guides price one, so treat that range as rougher. For an EICR on a typical 2 or 3-bed house it is £80, £150, £150, £150, £180, £250, £280, £280 and £300, which gives £150 to £280. A single unusually high or low guide moves the range very little.
Partial rewire cost
A partial rewire costs from about £300 for a single room to £6,000 for a large part of a house. Guides price it by the room or by the share of the house, so get the whole installation tested first.
| Job | What the guides say |
|---|---|
| Single room | MyJobQuote £300 to £800, about a day |
| Kitchen | MyJobQuote £500 to £1,500, 1 to 2 days |
| Garage | MyJobQuote £500 to £1,200, no more than a day |
| Kitchen, bathroom or one floor | BestBuilders £1,200 to £3,000, 2 to 4 days |
| Part of a 3-bed semi | BestBuilders £1,800 to £4,500, or 35 to 55% of a full rewire |
| Several circuits | Fantastic Services £2,000 to £6,000, depending on the circuits and access |
Read the detail
A partial rewire makes sense when an inspection finds the rest of the installation sound, or when one room is being gutted anyway, such as a new kitchen. The electrician still has to test and certify the new work and connect it safely to the old. MyJobQuote does not price a whole-house partial rewire and advises a survey first. If faults turn up all over the house, a series of partial jobs can cost close to a full rewire, so ask for both prices.
Adding a circuit or working in a bathroom is notifiable under Part P even on a small job, as the Part P section explains.
Consumer unit (fuse box) replacement cost
A standard new consumer unit costs £400 to £550 fitted, the middle of the three guides that price one. A board with surge protection, arc fault detection or an RCBO on every circuit costs more, up to about £1,400.
| Board | Price fitted | Time |
|---|---|---|
| Standard board with dual RCDs | £400 to £550 (our range) | 3 to 8 hours |
| RCBO on every circuit | Trade2Base £550 to £800 (16-way) | 3 to 7 hours |
| With surge protection (SPD) | BestBuilders £600 to £1,100 | 5 to 9 hours |
| With arc fault detection (AFDD) | BestBuilders £700 to £1,400 | 5 to 9 hours |
| Smart board | Trade2Base £750 to £1,100 | 3 to 7 hours |
| As part of a full rewire | Trade2Base £300 to £600; Rated People includes it in the rewire price | 2 to 4 hours |
The data behind this table
The standard board range is the middle half of the prices in BestBuilders (£450 to £900, basic replacement), Trade2Base (£400 to £550, 10-way dual RCD) and Rated People (about £320, VAT excluded), read on 11 November 2026. The other rows are each a single guide's figure. Times are BestBuilders' and Trade2Base's.
Read the detail
The consumer unit is the box where the supply splits into circuits. An old fuse box uses fuses that blow; a modern board uses circuit breakers that switch off, and residual current devices (RCDs) that cut the power when current leaks to earth, which protects against electric shock. On a dual RCD board each RCD protects a group of circuits, so one fault can switch off several at once. An RCBO combines the two on each circuit, so a fault switches off only that circuit. A surge protection device guards against voltage spikes, and an arc fault detection device against the sparking that a damaged cable can cause.
Replacing a consumer unit is notifiable under Part P, so use a registered electrician and keep the certificate. If you plan a heat pump, an EV charger or solar panels, ask for a board with spare ways now, as the section on new loads explains. Rated People notes that a new fuse box is sometimes included in a rewire quote, so check before paying twice.
EICR cost and when you need one
An EICR costs £150 to £280 for a typical 2 or 3-bed house, the middle of five guides, and takes about 2 to 4 hours. Landlords in England need one at least every 5 years; for owners it is advice, not law.
| Home | Outside London and the South East | London and the South East |
|---|---|---|
| Studio or 1-bed flat | £120 to £170 | £180 to £250 |
| 2-bed flat or small house | £140 to £220 | £220 to £300 |
| 3-bed house | £180 to £280 | £250 to £350 |
| 4-bed house | £220 to £330 | £300 to £400 |
| 5-bed house or larger | £300 to £400 | £380 to £500 |
The data behind this table
Fantastic Services' figures, the only guide of the five that prices every size of home, read on 11 November 2026. Our £150 to £280 range for a typical house uses all five guides, as set out in "How we work out our range" above. Times are from BestBuilders (2 to 4 hours), Rated People (3 to 4 hours) and Fantastic Services (2 to 4 hours for a house, 1 to 2 hours for a flat).
Read the detail
An EICR is an inspection and test of the fixed wiring: the consumer unit, the circuits, sockets, switches and lights. The inspector codes each fault. In the government's guidance for landlords, C1 means danger present, C2 potentially dangerous, C3 improvement recommended and FI further investigation needed without delay. Any C1 or C2 makes the installation unsatisfactory, and the work has to be put right; a C3 alone does not.
No law makes an owner-occupier get an EICR. Fantastic Services advises one every 10 years, and sooner when buying a home, after major electrical work or if the installation shows its age. It is also the cheapest way to find out whether you need a rewire at all, before you ask for quotes: a few coded faults usually mean repairs, while faults all over the house point to a rewire. If you are buying an older home, our home buyer energy check covers the other costs to look for.
Landlords: an EICR at least every 5 years
Landlords in England must have the electrical installation inspected and tested by a qualified person at least every 5 years, and give tenants a copy of the report. Councils can fine a landlord up to £40,000 for a breach.
| Duty | Deadline |
|---|---|
| Inspect and test the installation | At least every 5 years |
| Give the report to the existing tenant | Within 28 days of the inspection |
| Give the report to a new tenant | Before they move in |
| Give the report to a prospective tenant | Within 28 days of a request |
| Give the report to the council | Within 7 days of a request |
| Carry out remedial or investigative work | Within 28 days, or sooner if the report says so |
| Confirm the work to the tenant and the council | Within 28 days of finishing it |
Where this rule comes from
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, as amended in 2025 to cover social housing, and the government's guidance on them (MHCLG, published 1 November 2025). The guidance says landlords must have the electrical installations in their properties "inspected and tested by a qualified person at least every 5 years", obtain a report, "usually an Electrical Installation Condition Report", and meet the standards in the 18th edition of the Wiring Regulations, BS 7671. For social housing the rules apply to tenancies granted after 1 December 2025, and to older social tenancies from 1 May 2026. The penalty of up to £40,000 is in section 6 of the guidance.
Read the detail
The rules cover any tenant who pays rent and lives in the home as their only or main residence. The guidance lists the exceptions, including lodgers who share with the landlord or the landlord's family, leases of 7 years or more, student halls, hostels and refuges, and care homes. A landlord who does not do the remedial work can have it done by the council, which can then recover the cost.
The rules are for England; Wales and Scotland set their own. Landlords also have to meet the minimum EPC rules, which our landlord EPC guide and landlord EPC calculator cover. A rewire between tenancies, while the property is empty, is usually quicker, as the guides above note.
Part P: getting the work signed off
In England, installing a new circuit, replacing a consumer unit, or adding to or altering circuits in a bathroom is notifiable work under Part P. A full rewire puts in new circuits, so it always has to be certified.
| Route | How it works | Cost on the guides' figures |
|---|---|---|
| Registered electrician | A member of a competent person scheme certifies its own work; the certificate goes to you and to building control within 30 days | No extra charge (Trade2Base); BestBuilders lists £80 to £200 for notification |
| Registered third-party certifier | An installer who is not registered appoints a certifier before work starts and notifies them within 5 days of finishing | Not priced by the guides |
| Building control | You or the installer notify the council's building control, which checks the work | BestBuilders £150 to £400; Trade2Base about £300 |
Where this rule comes from
Regulation 12(6A) of the Building Regulations 2010, as quoted in Approved Document P, 2013 edition, paragraph 2.5: notifiable work is "the installation of a new circuit", "the replacement of a consumer unit" or "any addition or alteration to existing circuits in a special location", which means the space around a bath or shower. Paragraphs 3.4 to 3.7 set the 30-day and 5-day deadlines. Paragraph 2.7 says all other electrical installation work, including "replacements, repairs and maintenance anywhere", is not notifiable.
Read the detail
At the end of a rewire you should get two documents: an electrical installation certificate to BS 7671 from the electrician, and a Building Regulations compliance certificate from the electrician's scheme or from building control. Keep both. A buyer's solicitor may ask for them when you sell. Part P does not stop you doing non-notifiable work yourself, but it still has to be safe, and Approved Document P's own example shows how fine the line is: fitting a built-in cooker is not notifiable unless it needs a new cooker circuit.
These rules are for England. Wales, Scotland and Northern Ireland set their own.
Planning for a heat pump, EV charger or induction hob
A rewire is the easiest time to prepare for a heat pump, an EV charger or an induction hob, because the floors and walls are already open. Each usually needs its own circuit from the consumer unit, and a new circuit is notifiable work.
| If you may add | Ask for this during the rewire |
|---|---|
| A heat pump | A spare way in the consumer unit and a cable route to where the outdoor unit could go |
| An EV charger | A spare way or room for a sub-board, and a cable route to the drive |
| An induction hob | A dedicated cooker circuit to the kitchen |
| Solar panels or a battery | A spare way and a cable route from the loft to the consumer unit |
Read the detail
Each of these normally gets its own circuit. Running the cable while the floors are up, and choosing a consumer unit with spare ways, saves lifting floors and chasing walls again later. Added afterwards, BestBuilders prices a 7kW EV charger at £800 to £1,400, or £1,300 to £2,200 where the fuse board has to be upgraded too, and an EV sub-board and earth at £200 to £450.
Whether the incoming supply can carry a heat pump, a charger and a hob at once depends on the appliances and the home, so we do not give load figures. Ask the electrician to check the main fuse and the supply as part of the rewire; for a large new load they may need to contact your network operator. To size and price a heat pump for your home, use our heat pump calculator. To see what an electric car would cost to run, use the EV cost calculator, and if you rent or live in a flat, check the EV chargepoint grant. If you are also weighing up how to heat the home, our guide to an electric boiler or a heat pump compares the running costs.
Plastering, decorating and other extras
Making good the walls and redecorating are usually extra, at £600 to £1,500 on BestBuilders' figures. Ask every electrician what their price leaves out.
| Item | What the guides say |
|---|---|
| Plastering and redecorating | BestBuilders £600 to £1,500 |
| Full plastering | MyJobQuote from £450 per room |
| Painting and decorating | MyJobQuote about £400 per room |
| Lifting and refitting carpets | Rated People about £250 a day for a carpet fitter |
| Skip hire | MyJobQuote £60 to £130 |
| An extra socket | BestBuilders £80 to £180 |
| An extra lighting circuit | BestBuilders £200 to £450 |
Read the detail
A rewire means chasing channels in walls and lifting floorboards, so plan the decorating for afterwards, not before. Rated People's price includes filling the holes with plaster; most others leave plastering out. Fittings change the price too: MyJobQuote puts standard sockets and fittings for a 3-bed house at about £1,050 in materials and premium finishes at £2,000 or more. In an older home, ask whether an asbestos check is needed before any walls or ceilings are cut; MyJobQuote lists asbestos testing among the costs of rewiring a period property.
Do you need a full rewire?
Only an inspection can tell you. An EICR with C1 or C2 faults across the house points to a rewire; a handful of faults points to repairs or a partial rewire.
Read the detail
Signs worth an inspection include an old fuse box with fuses you rewire by hand, no RCD protection, sockets or switches that are scorched or warm, lights that flicker, and old rubber or fabric covered cable where you can see it, for example in the loft. None of these on its own proves you need a full rewire, which is why the report comes first. A rewire also suits a bigger project: if you are gutting rooms, converting the loft or adding an extension, do the electrics at the same time.
How to get quotes
Get at least three itemised quotes for the same job from registered electricians, and compare what each includes. A cheap quote that leaves out the consumer unit, testing and making good is not cheap.
Read the detail
- Give every electrician the same list: the number of sockets, switches and lights in each room, and any new circuits you want, such as a cooker, an EV charger or a heat pump.
- Ask whether the price includes the consumer unit and which type, the EICR or test certificate on completion, Part P notification, and plastering.
- Ask which competent person scheme the electrician belongs to, and check it on the scheme's own register.
- Ask how many days you will be without power, and whether you can stay in the house.
- Ask what happens if they find asbestos or damaged joists, and how extras will be priced.
We do not recommend electricians yet, and no link on this page is paid. When we do, every firm will have to meet our trusted supplier standard. If you are converting the loft at the same time, see our loft conversion cost guide: it is worth planning the two together.
Frequently asked questions
How much does it cost to rewire a house in the UK?
A full rewire of a typical 3-bed house costs £5,500 to £6,500 in 2026, the middle half of the prices five UK cost guides publish. Expect about £3,500 to £5,000 for a 2-bed home, £7,000 to £8,500 for a 4-bed house and £8,500 to £12,000 for a 5-bed house. Plastering and redecorating are usually extra, and London prices run higher.
How much does a new consumer unit cost?
A standard consumer unit with dual RCDs costs £400 to £550 fitted, the middle of the three guides that price one. A board with surge protection, arc fault detection or an RCBO on every circuit costs more, up to about £1,400. Replacing a consumer unit is notifiable work under Part P, so use a registered electrician.
How much does an EICR cost?
About £150 to £280 for a typical 2 or 3-bed house, the middle of the prices in five UK cost guides. A 1-bed flat costs from about £120, and a 5-bed house £300 to £400, or up to £500 in London and the South East. The inspection usually takes 2 to 4 hours.
Do landlords need an EICR every 5 years?
Yes, in England. Landlords must have the electrical installation inspected and tested by a qualified person at least every 5 years, give the report to existing tenants within 28 days and to new tenants before they move in, and fix any C1 or C2 faults within 28 days. Councils can impose a penalty of up to £40,000.
Does a rewire need Building Regulations approval?
Yes. In England, installing a new circuit or replacing a consumer unit is notifiable under Part P of the Building Regulations, so a rewire has to be certified. A registered electrician can certify their own work and their scheme sends you a compliance certificate within 30 days; otherwise you need building control or a registered third-party certifier.
How long does it take to rewire a house?
Usually 4 to 10 days on site for a 3-bed house, 2 to 5 days for a 1-bed flat and up to 16 days for a 5-bed house, on the five guides' figures. An empty house is quicker: Trade2Base says labour time rises by 20 to 30% when the home is lived in.
Should I plan for a heat pump or EV charger when rewiring?
Yes, if you might add one. Each usually needs its own circuit, so ask for a consumer unit with spare ways and a cable route to where the heat pump or charger could go while the floors are up. Added later, BestBuilders prices a 7kW EV charger at £800 to £1,400, or £1,300 to £2,200 with a fuse board upgrade.
Data sources
Updated 11 November 2026.
Prices come from five UK cost guides, read on 11 November 2026. The landlord rules come from the government's guidance on the Electrical Safety Standards Regulations, and Part P from Approved Document P.
Show every source
Rewiring, consumer unit and EICR prices: MyJobQuote, How much does it cost to rewire a house in the UK? (updated 3 November 2026); BestBuilders, Rewiring cost UK (updated 31 August 2026, VAT included, from its own regional cost model); Rated People, How much does rewiring cost for an average home? (first published 27 September 2022, costs stated as accurate as of 2026, VAT excluded); Fantastic Services, How much does house rewiring cost? and Fantastic Services, How much does an EICR cost? (2026 prices, VAT included); Trade2Base, Full house rewire costs UK (8 June 2026, written for electricians). All read on 11 November 2026.
Landlord duties from the Electrical safety standards in the private and social rented sectors: guidance (MHCLG, 1 November 2025) and The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, as amended in 2025. Notifiable work from Approved Document P: electrical safety, dwellings, 2013 edition, paragraphs 2.5, 2.7, 2.8 and 3.4 to 3.7. Full method on our methodology and data sources pages.